Choosing integration points

Prerequisite: Platform Essentials for Technical Teams. · Professional · Integrations and Data Exchange · Step 1: Integration planning

Introduction

What this covers

How to list the other systems a factory uses, who owns each one, which way the data moves, and which single integration removes the most re-typing.

Why it matters on the floor

Connecting everything on day one multiplies failures. The first integration should be the one that deletes the largest manual copy.

By the end you can

  • List each external system, its owner, and the direction data moves
  • Choose the first integration by how much re-entry it removes
  • Leave later systems on the list, unconnected, until the first one is stable

About 12 minutes. Prerequisites: None. This opens the integrations level.

Professional · Integrations and Data Exchange Module: Step 1: Integration planning

Plan and secure integrations with accounting, logistics, machinery and partner systems.

Prerequisite: Platform Essentials for Technical Teams.

Decide what to connect and why.

Pick the few that matter

List each system the factory uses, who owns it, and which direction data moves. Start with the integration that removes the most manual re-entry.

Learning objectives

  • List each external system, its owner, and the direction data moves
  • Choose the first integration by how much re-entry it removes
  • Leave later systems on the list, unconnected, until the first one is stable

Walk the screen

  1. Sit with each department and write the system name they already use, such as a weighbridge PC or a spreadsheet. Do not invent a connector that the product has not described.
  2. For each system write the owner and the direction: into FactoraERP, out of FactoraERP, or both.
  3. Mark every place a person re-types a lot number, a weight, or a customer.
  4. Rank those places by how often the re-type happens and how often it is wrong.
  5. Pick the top one as the first integration. Say the others will wait.
  6. Write the decision in the scope note so a later workshop does not quietly add three more connections.

Worked example

The sample mill re-types the weighbridge net into a sheet every truck, about forty times a day, and re-types the customer name once a week. The first integration to discuss is the one that stops the weighbridge re-type. The weekly customer sheet waits.

Common mistakes

  • Connecting every system because the diagram looks complete.
  • Starting with a rare report and leaving the daily re-type in place.
  • Skipping the owner, then having nobody to ask when the feed stops.

Recap

  • List systems, owners, and direction before you connect anything.
  • Start with the integration that removes the most manual re-entry.
  • Write the 'not yet' list into the scope.