Data mapping

Professional · Integrations and Data Exchange · Step 1: Integration planning

Introduction

What this covers

How to fill a mapping sheet that names the source of truth, the format, and the conflict rule for every field before any integration is built.

Why it matters on the floor

Without that sheet the integration guesses, and two systems both think they own the net weight.

By the end you can

  • For each field, name the source of truth, the format, and how a conflict is resolved
  • Keep the sheet agreed before anyone builds the connection
  • Map the lot reference and the net weight explicitly, because those are the fields people re-type

About 12 minutes. Prerequisites: Choosing integration points.

Professional · Integrations and Data Exchange Module: Step 1: Integration planning

Mapping

For every field decide: source of truth, format, and how conflicts are resolved. Document it in a mapping sheet before writing anything.

Learning objectives

  • For each field, name the source of truth, the format, and how a conflict is resolved
  • Keep the sheet agreed before anyone builds the connection
  • Map the lot reference and the net weight explicitly, because those are the fields people re-type

Walk the screen

  1. Open a mapping sheet with columns: field, source of truth, format, conflict rule, FactoraERP screen.
  2. Lot reference: source of truth is Material Intake once the delivery is saved. Format is the reference FactoraERP assigns. Conflict rule: do not overwrite it from the other system.
  3. Net weight: source of truth is the weighbridge ticket captured on the intake. Format is kilograms. Conflict rule: a later correction uses Request Correction, not a silent overwrite.
  4. Customer and supplier names: source of truth is the Customers or Suppliers screen. Format is the existing record, not free text on each order.
  5. Walk the sheet with the system owner. A field with no owner does not get integrated.
  6. Freeze the sheet. Changes after build go through the same columns, not a chat message.

Worked example

The weighbridge file has a column 'NET'. The sheet says source of truth is the ticket photo plus the gross and tare on Material Intake, format kilograms, conflict rule is Request Correction. The integration may display the file, but it may not replace 12,200 kg because the file says 12,000.

Common mistakes

  • Starting the build with a sample file and no conflict rule.
  • Letting both systems update net weight.
  • Mapping a field because it exists, even though nobody owns it.

Recap

  • Every field needs a source of truth, a format, and a conflict rule.
  • Write the sheet before building.
  • Net weight stays with the intake correction path.

Quiz for this module: Step 1: Integration planning.

Create a free account or log in to save this lesson on your progress.

Check understanding

Progress is stored in this browser until you log in. Passing is 70%.

1. What should you define for each field before integrating?
2. You should start with the integration that removes the most manual work.
3. A conflict on net weight should be handled by
4. A field with no owner should still be integrated.