Time windows
Today in OEE, Command Center, and Executive is calendar midnight → now, not the configured shift end.

Shift uses configured shift minutes, or an open handover when the range is shift.
Energy production in a window uses the same production engine as OEE (counters and overlapping runs). It does not sum run totalCount blindly. If produced is 0, intensity is insufficient — not zero.
When you demo “today after 17:00”, today still includes the evening. Shift may already have ended.
Walk the screen
- Read today as calendar midnight to now on OEE, Command Center, and Executive.
- Read shift from the configured shift minutes, or from an open handover when that range is selected.
- Remember energy production uses the same evidence as OEE: counters and overlapping runs.
- If produced is zero, intensity is insufficient, not zero.
- When you demo after 17:00, today still includes the evening even if the shift has ended.
Worked example
At 18:00 the shift has ended and today still includes the afternoon run. Energy intensity is blank rather than 0.00 because the window you picked has no production. You do not paste last week's intensity into the gap.
Common mistakes
- Explaining today as 'since the shift started'.
- Showing 0.00 intensity when nothing was produced.
- Summing a run total by hand instead of the production engine.
Recap
- Today starts at midnight. Shift uses the configured shift.
- Intensity needs production evidence.
- Zero production is insufficient, not zero.