Implementation
Project managers and site leads. Survey, commission, cut over from DEMO to live, and hand the plant to operators. About 96 minutes.
- Site survey · 18 min — RF, power, backhaul, and hazardous-area checklist before hardware lands.
- Create the factory in ops · 12 min — Pack, omit areas, ERP mode. Save the one-time passwords.
- Commissioning · 20 min — Registry naming, map, alerts, shift, OEE config, tariffs.
- Cutover demo to live · 12 min — telemetryMode live turns the simulator off. DEMO labels must go away.
- Role training and handover · 14 min — Admin, maintenance, operator, and ops owner vs viewer.
- Hypercare and audit · 12 min — What to watch, what to escalate, audit trail.