Commissioning

Registry naming, map, alerts, shift, OEE config, tariffs.

Commissioning

Still telemetryMode=demo until cutover so the simulator can prove the UI, or leave simulator off and use live MQTT from day one — pick one and label it.

  1. Device codes stable and printable (match MQTT usernames).
  2. Floor map placement (machine vs line vs area).
  3. Alert rules: min/max, offline seconds, severity. Door is binary.
  4. Shift hours used for shift range; today is still midnight.
  5. OEE config (admin): ideal rates on runs, not invented plant-wide 85%.
  6. Utility tariffs for energy cost estimates.
  7. Gateways registered with heartbeat.
  8. Role training: operator ack vs maintenance resolve.

Check understanding

Progress is stored in this browser only. Passing is 70%.

1. Alert thresholds should be copied from a brochure typical value when the plant has no spec.