Configuration checklist

Foundation · Implementation Methodology · Step 2: Configure, train, accept

Introduction

What this covers

How to configure users and roles, products and units, warehouses and bins, suppliers and customers, approval rules, and document templates before users arrive for testing.

Why it matters on the floor

Users cannot accept a system that has no bins and no suppliers. The checklist is the difference between a walkthrough and a blocked test.

By the end you can

  • Tick users, roles, products, units, warehouses, bins, suppliers, customers, approval rules, and templates
  • Use demo or cleansed records, not a live customer's private file, in a training workspace
  • Stop and fix a missing checklist line before user acceptance starts

About 12 minutes. Prerequisites: Phasing the rollout.

Foundation · Implementation Methodology Module: Step 2: Configure, train, accept

Deliver and hand over.

Checklist

Users and roles, products and units, warehouses and bins, suppliers and customers, approval rules, document templates.

Learning objectives

  • Tick users, roles, products, units, warehouses, bins, suppliers, customers, approval rules, and templates
  • Use demo or cleansed records, not a live customer's private file, in a training workspace
  • Stop and fix a missing checklist line before user acceptance starts

Walk the screen

  1. Users and roles: create one user per job you will test. Do not share a single admin.
  2. Products and units: kilograms where the intake lesson uses kilograms. Do not mix a bag and a kilogram on the same material without a conversion you have written down.
  3. Warehouses and bins: Warehouse, then Storage. Create the locations the phase will actually use, including a quarantine spot for failed lots.
  4. Suppliers and customers: load the cleansed list. A supplier that is not on the list cannot be selected on Log Intake.
  5. Approval rules: the logger is not the approver. Payroll and leave rules stay in place even if those modules are later phases.
  6. Document templates: the intake needs a place for the weighbridge ticket and the goods received note.

Worked example

Before testing, the sample workspace has a receiving user, a lab user, and an approver; a raw-material unit of kilograms; one warehouse with a bin and a quarantine location; and two demo suppliers. The test truck can be logged. A third supplier is not typed at the gate during the test. It is added on Suppliers first.

Common mistakes

  • Starting user testing with an empty supplier list.
  • One shared login for the tester and the approver.
  • Skipping bins and then discovering the lot cannot be stored.

Recap

  • The checklist is users, roles, products, units, warehouses, bins, suppliers, customers, approval rules, and templates.
  • A supplier must exist before intake.
  • The tester and the approver are different users.