Discovery workshops

Foundation · Implementation Methodology · Step 1: Scoping the project

Introduction

What this covers

How to run a workshop with each department, capture the current process, the pains, the reports, and the integrations, and finish with a signed scope.

Why it matters on the floor

An unsigned scope grows during configuration. The signature is what the later phases are allowed to include.

By the end you can

  • Run a workshop per department and write the current process in their words
  • Capture pains, required reports, and integrations on the same page
  • End with a signed scope that later lessons are not allowed to exceed quietly

About 12 minutes. Prerequisites: None. This opens implementation methodology.

Foundation · Implementation Methodology Module: Step 1: Scoping the project

The phases of a FactoraERP rollout: scoping, configuration, training and acceptance.

Agree outcomes, modules and timeline.

Workshops

Run process workshops with each department. Capture current process, pain points, required reports and integrations. Finish with a signed scope.

Learning objectives

  • Run a workshop per department and write the current process in their words
  • Capture pains, required reports, and integrations on the same page
  • End with a signed scope that later lessons are not allowed to exceed quietly

Walk the screen

  1. Invite the people who do the work, not only the sponsor. Receiving, lab, warehouse, production, sales, and finance each get a session if they are in scope.
  2. Ask them to walk one real batch as it happens today. Write the system or paper at each step.
  3. Mark pains with their words: rejected lots, stock-outs, audit findings, slow month-end.
  4. List the reports they already produce and which screen in FactoraERP should replace each one.
  5. List integrations using the rule from the technology track: owner, direction, and the one that removes the most re-typing.
  6. Read the scope back and get it signed. Items not on the page are out of this project.

Worked example

The sample mill workshop writes: intake on paper, lab in a notebook, warehouse on a whiteboard, sales in a sheet. The signed scope includes intake, lab, warehouse, and traceability. Payroll is discussed and explicitly marked out of phase one.

Common mistakes

  • A single workshop with only the sponsor.
  • Leaving the scope unsigned because everyone nodded.
  • Adding a module in week three because a new person asked.

Recap

  • Workshops capture the current process, pains, reports, and integrations.
  • They finish with a signed scope.
  • Out of scope stays written down.